MARINE PARK WATER RECLAMATION FACILITY - Operations and Maintenance Manual

<-- Previous Section
Home

Next Section -->
 

List of Tables


Section 10.  Influent Pumping

10.04.a.1.  SMALL-SMALL Sequencing Mode
10.04.a.2.  SMALL-LARGE Sequencing Mode
10.04.b.1.  Equipment Status - Influent Wet Well Gate
10.04.b.2.  Equipment Status - Influent Pumps

Section 15.  Screenings Removal

15.04.b.1.  Equipment Status - Influent Channel
15.04.b.2.  Equipment Status - Mechanically Cleaned Barscreens
15.04.b.3.  Equipment Status - Screenings Conveyor
15.04.b.4.  Equipment Status - Screenings Presses
15.04.b.5.  Equipment Status - Parshall Flumes
15.04.b.6.  Equipment Status - Raw Sewage Sampler
15.04.b.7.  Equipment Status Table - Screening Effluent Channel
15.05.a.1.  Troubleshooting - Influent Channel/Barscreens
15.05.a.2.  Troubleshooting - Screenings Conveyor
15.05.a.3.  Troubleshooting - Screenings Press

Section 20.  Grit Removal

20.04.b.1.  Equipment Status - Grit Chambers
20.04.b.2.  Equipment Status - Grit Blowers
20.04.b.3.  Equipment Status - Grit Pumps
20.04.b.4.  Equipment Status - Grit Classifiers
20.05.a.1.  Troubleshooting - Grit Blowers
20.05.a.2.  Troubleshooting - Grit Pumps and Grit Chambers
20.05.a.3.  Troubleshooting - Grit Classifiers

Section 25.  Primary Clarification

25.04.b.1.  Equipment Status - Primary Clarifiers
25.04.b.2.  Equipment Status - Primary Sludge Pumps
25.04.b.3.  Equipment Status - Scum Skimmers
25.04.b.4.  Equipment Status - Scum Flush Water Pumps
25.04.b.5.  Equipment Status - Primary Scum Pumps
25.04.b.6.  Equipment Status - Primary Effluent Sampler
25.04.b.7.  Equipment Status - Primary Influent Channel
25.04.b.8.  Equipment Status - Primary Effluent Channel
25.05.a.1.  Troubleshooting - Primary Clarifier
25.05.a.2.  Troubleshooting - Primary Sludge Pumps
25.05.a.3.  Troubleshooting - Primary Scum Skimmers
25.05.a.4.  Troubleshooting - Primary Scum Flush Water Pumps
25.05.a.5.  Troubleshooting - Primary Scum Pumps

Section 30.  Activated Sludge

30.04.b.1.  Equipment Status - Process Blowers
30.04.b.3.  Equipment Status - Secondary Clarifiers
30.04.b.4.  Equipment Status - Ducking Scum Skimmers
30.05.a.1.  Troubleshooting - Foaming Problems in the Aeration Basins
30.05.a.2.  Troubleshooting - Sludge Bulking Problems in the Secondary Clarifiers
30.05.a.3.  Troubleshooting - Nitrification Problems

Section 35.  UV Disinfection

30.04.b.1.  Equipment Status - UV Influent Channel Gates

Section 40 - Air Treatment System

40.04.b.1.  Equipment Status - Scrubber Recirculation Liquor Pumps
40.04.b.2.  Equipment Status - Odor Scrubber Blowdown
40.04.b.3.  Equipment Status - Odor Exhaust Fans
40.04.b.4.  Equipment Status - Chemical Addition
40.05.a.1.  Troubleshooting - Air Treatment System

Section 45.  Chemical Delivery System

45.04.b.1.  Equipment Status - Shock Application System
45.04.b.2.  Equipment Status - Sludge Transport System
45.04.b.3.  Equipment Status - W3 Water Supply

Section 50.  In-Plant Washdown Pump Station

50.04.b.1.  Equipment Status - In-Plant Washdown Pump Station
50.05.a.1.  Troubleshooting - In-Plant Washdown Dump Station

Section 55.  RAS/WAS Pump Station

55.04.b.1.  Equipment Status - RAS Pumps
55.04.b.2.  Equipment Status - WAS Pumps
55.04.b.3.  Equipment Status - SSM Pump
55.05.a.1.  Troubleshooting - RAS Pumps
55.05.a.2.  Troubleshooting - WAS Pumps
55.05.a.3.  Troubleshooting - SSM Pump

Section 60.  Facilities

60.25.b.1.  W2 Primary Elements, Location and Element Numbers
60.25.e.1.  W2 Pump Motor Horsepowers
60.25.f.1.  W2 Non-Potable Water System Troubleshooting Guide
60.30.e.1.  W3 Primary Elements, Locations, and Element Numbers
60.30.g.1.  Set Points for Sequencing W3 Pump Operation
60.30.h.1.  W3 Non-Potable Water System Troubleshooting Guide
60.33.b.1.  Areas Served by Fire Sprinkler Systems
60.45.c.1.  Indoor HVAC Design Criteria
60.45.e.1.  Influent Pump Station HVAC Equipment
60.45.f.1.  Screenings Area HVAC Equipment
60.45.g.1.  Screenings/Grit Handling Area HVAC Equipment
60.45.i.1.  Headworks Blower Room HVAC Equipment
60.45.j.1.  Primary Clarifiers HVAC Equipment
60.45.k.1.  Odor Control Fans
60.45.l.1.  Aeration Building HVAC Equipment
60.45.m.1.  RAS Pump Station HVAC Equipment
60.45.n.1.  Effluent Treatment Complex HVAC Equipment
60.45.o.1.  Chemical Building HVAC Equipment
60.50.b.1.  Hoist and Monorail Systems
60.50.c.1.  Influent Pump Station and Effluent Complex Traveling Cranes
60.50.d.1.  Effluent Pump Station Traveling Crane
60.50.e.1.  Portable Hoist Wall Socket Locations
60.65.b.1.  Sump Pump Locations and Specifications
60.65.f.1.  Sump Pump Alarms

Section 65.  Staffing Plan

65.01.  U.S. Filter/OS Vancouver Staffing Plan

Section 80.  Emergency Response Plan

80.a.1.  Vancouver Emergency Communication Matrix



<-- Previous Section
Home

Next Section -->