<-- Previous Section | Next Section --> | |
| 01.01 | Design Criteria |
| 01.02 | Design Criteria (Continued) |
| 01.03 | Location Map |
| 01.04 | Plant Site Plan |
| 01.05 | Plant Process Flow Schematic |
| 01.06 | Plant Hydraulic Profile |
| 10.01 | Panel Section of MCC-01 |
| 10.02 | Panel Section of MCC-02 |
| 10.03 | Panel Section of MCC-03 |
| 10.04 | Panel Section of MCC-04 |
| 10.05 | Influent Pumping AFD Panel |
| 10.06 | LCP-01 |
| 10.07 | Auxilliary START/STOP Push-buttons |
| 10.08 | Handswitch Controls for G-01000 |
| 10.09 | Influent Pump Station Cross Section |
| 10.10 | Influent Pump Station Plan View - Pump Level |
| 10.11 | Influent Pump Station Plan View - Motor Level |
| 10.12 | Dry Well Cross Section |
| 10.13 | Motor Control Room Cross Section |
| 10.14 | Influent Pumping P&ID |
| 15.01 | Mechanically Cleaned Bar Screen Local Panel |
| 15.02 | Screenings Press Local Panel |
| 15.03 | Screenings Conveyor Auxilliary START/STOP Push-buttons and Emergency Stop Pull Cord |
| 15.04 | Screenings Removal Area Plan View - Upper Level |
| 15.05 | Screenings/Grit Handling Plan View - Upper Level |
| 15.06 | Screenings Removal Area Cross Section |
| 15.07 | Screenings/Grit Handling Area Cross Section |
| 15.08 | Screenings P&ID |
| 15.09 | Screenings and Grit Handling P&ID |
| 20.01 | Grit Blower Auxiliary START/STOP Push-buttons |
| 20.02 | Grit Pump Auxiliary START/STOP Push-buttons |
| 20.03 | Grit Classifier Auxiliary START/ Push-buttons |
| 20.04 | Grit Chambers Area Upper Level - Plan View |
| 20.05 | Grit Chambers Lower Level - Plan View |
| 20.06 | Grit Chamber Pipe Gallery Cross Section |
| 20.07 | Grit Chambers Cross Section |
| 20.08 | Cyclone Degritter/Grit Classifier Cross Section |
| 20.09 | Grit Removal P&ID |
| 25.01 | Sludge Collector Momentary STOP Push-button |
| 25.02 | Primary Sludge Pump Momentary STOP Push-button |
| 25.03 | Scum Skimmer Momentary STOP Push-button |
| 25.04 | Primary Scum Pump Momentary STOP Push-button Located at the Primary Scum Pit |
| 25.05 | Primary Scum Pump Momentary STOP Push-button Located at the Primary Scum Pump |
| 25.06 | Primary Sludge Pump Gallery Plan View |
| 25.07 | Primary Sludge Pump Gallery Cross Section |
| 25.08 | Primary Clarifier Cross Section |
| 25.09 | Primary Clarifier Sludge Collection Plan View |
| 25.10 | Primary Clarifier Scum Collection Plan View |
| 25.11 | Sludge Surge Tank Isometric View |
| 25.12 | Primary Clarification & Solids Pumping P&ID |
| 30.01 | Panel Section MCC-05 |
| 30.02 | Panel Section MCC-06 |
| 30.03 | Panel Section MCC-07 |
| 30.04 | Panel Section MCC-08 |
| 30.05 | Process Blower Local Panel |
| 30.06 | Aeration Mixer Momentary STOP Push Button |
| 30.07 | Mixed Liquor Recycle Pump Momentary STOP Push Button |
| 30.08 | Secondary Clarifier Momentary STOP Push Button |
| 30.09 | Process Blower Room Plan View |
| 30.10 | Process Blower Room Cross Section |
| 30.11 | Aeration Basins Plan View |
| 30.12 | Aeration Basin Zone 1 Cross Section |
| 30.13 | Aeration Basin Zone 2 Cross Section |
| 30.14 | Aeration Basin Zones 1 & 5 Cross Section |
| 30.15 | Aeration Basin Zones 1 & 2 Plan View |
| 30.16 | Secondary Clarifier Cross Section |
| 30.17 | Secondary Clarifier Plan View |
| 30.18 | Secondary Clarifiers and RAS/WAS Pump Station Plan View |
| 30.19 | Aeration Basin P&ID |
| 30.20 | Aeration Blower P&ID |
| 30.21 | Secondary Clarifier P&ID |
| 35.01 | LCP-16 |
| 35.02 | UV Cleaning Basin Auxiliary START/STOP Push-buttons |
| 35.03 | UV Disinfection Plan View |
| 35.04 | Panel Section MCC-10 |
| 35.05 | Panel Section MCC-11 |
| 35.06 | UV Lamp Module Cross Section |
| 35.07 | UV Disinfection Cross Section |
| 35.08 | Disinfection Channel #2 Cross Section |
| 35.09 | Disinfection Basin P&ID |
| 40.01 | Scrubber Recirculation Pump Auxiliary | START/STOP Push-buttons |
| 40.02 | Makeup Water Rotameter | |
| 40.03 | Blowdown Valve OCR Handswitch | |
| 40.04 | Chemical Feed Pump Local Panel | |
| 40.05 | Location of the ORP and pH Probes | |
| 40.06 | Air Treatment System Plan View | |
| 40.07 | Air Treatment System Cross Section | |
| 40.08 | Scrubber Tower Detail | |
| 40.09 | Air Treatment P&ID |
| 45.01 | Dilution Water Rotameter |
| 45.02 | Chemical Building Plan View |
| 45.03 | Chemical Building View of South Wall |
| 45.04 | Chemical Feed System Cross Section |
| 45.05 | Chemical Feed System P&ID |
| 50.01 | LP-14051 |
| 50.02 | In-Plant Pump Station Plan View |
| 50.03 | In-Plant Pump Station Cross Section |
| 55.01 | Pump Section MCC-09 |
| 55.02 | RAS Pump AFD Panel |
| 55.03 | Secondary Scum Pump Auxiliary START/STOP Push-Button and Scum/Water Handswitch |
| 55.04 | RAS/WAS PS Upper Level Plan View |
| 55.05 | RAS/WAS PS Lower Level Plan View |
| 55.06 | Secondary Scum Box Plan View |
| 55.07 | RAS/WAS Pumping P&ID |
| 60.03 | W2 Pump Devices on Panel LP-11040 |
| 65.01 | Staffing Plan Recommended for the MPWRF |
| 75.01 | Preventive Maintenance Task Listing |
| 75.02 | Preventive Maintenance Schedule |