MARINE PARK WATER RECLAMATION FACILITY - Operations and Maintenance Manual

<-- Previous Section
Home

Next Section -->
 

List of Figures


Section 01.  Introduction

01.01  Design Criteria
01.02  Design Criteria (Continued)
01.03  Location Map
01.04  Plant Site Plan
01.05  Plant Process Flow Schematic
01.06  Plant Hydraulic Profile

Section 10.  Influent Pumping

10.01  Panel Section of MCC-01
10.02  Panel Section of MCC-02
10.03  Panel Section of MCC-03
10.04  Panel Section of MCC-04
10.05  Influent Pumping AFD Panel
10.06  LCP-01
10.07  Auxilliary START/STOP Push-buttons
10.08  Handswitch Controls for G-01000
10.09  Influent Pump Station Cross Section
10.10  Influent Pump Station Plan View - Pump Level
10.11  Influent Pump Station Plan View - Motor Level
10.12  Dry Well Cross Section
10.13  Motor Control Room Cross Section
10.14  Influent Pumping P&ID

Section 15.  Screenings Removal

15.01  Mechanically Cleaned Bar Screen Local Panel
15.02  Screenings Press Local Panel
15.03  Screenings Conveyor Auxilliary START/STOP Push-buttons and Emergency Stop Pull Cord
15.04  Screenings Removal Area Plan View - Upper Level
15.05  Screenings/Grit Handling Plan View - Upper Level
15.06  Screenings Removal Area Cross Section
15.07  Screenings/Grit Handling Area Cross Section
15.08  Screenings P&ID
15.09  Screenings and Grit Handling P&ID

Section 20.  Grit Removal

20.01  Grit Blower Auxiliary START/STOP Push-buttons
20.02  Grit Pump Auxiliary START/STOP Push-buttons
20.03  Grit Classifier Auxiliary START/ Push-buttons
20.04  Grit Chambers Area Upper Level - Plan View
20.05  Grit Chambers Lower Level - Plan View
20.06  Grit Chamber Pipe Gallery Cross Section
20.07  Grit Chambers Cross Section
20.08  Cyclone Degritter/Grit Classifier Cross Section
20.09  Grit Removal P&ID

Section 25.  Primary Clarification

25.01  Sludge Collector Momentary STOP Push-button
25.02  Primary Sludge Pump Momentary STOP Push-button
25.03  Scum Skimmer Momentary STOP Push-button
25.04  Primary Scum Pump Momentary STOP Push-button Located at the Primary Scum Pit
25.05  Primary Scum Pump Momentary STOP Push-button Located at the Primary Scum Pump
25.06  Primary Sludge Pump Gallery Plan View
25.07  Primary Sludge Pump Gallery Cross Section
25.08  Primary Clarifier Cross Section
25.09  Primary Clarifier Sludge Collection Plan View
25.10  Primary Clarifier Scum Collection Plan View
25.11  Sludge Surge Tank Isometric View
25.12  Primary Clarification & Solids Pumping P&ID

Section 30.  Activated Sludge

30.01  Panel Section MCC-05
30.02  Panel Section MCC-06
30.03  Panel Section MCC-07
30.04  Panel Section MCC-08
30.05  Process Blower Local Panel
30.06  Aeration Mixer Momentary STOP Push Button
30.07  Mixed Liquor Recycle Pump Momentary STOP Push Button
30.08  Secondary Clarifier Momentary STOP Push Button
30.09  Process Blower Room Plan View
30.10  Process Blower Room Cross Section
30.11  Aeration Basins Plan View
30.12  Aeration Basin Zone 1 Cross Section
30.13  Aeration Basin Zone 2 Cross Section
30.14  Aeration Basin Zones 1 & 5 Cross Section
30.15  Aeration Basin Zones 1 & 2 Plan View
30.16  Secondary Clarifier Cross Section
30.17  Secondary Clarifier Plan View
30.18  Secondary Clarifiers and RAS/WAS Pump Station Plan View
30.19  Aeration Basin P&ID
30.20  Aeration Blower P&ID
30.21  Secondary Clarifier P&ID

Section 35.  UV Disinfection

35.01  LCP-16
35.02  UV Cleaning Basin Auxiliary START/STOP Push-buttons
35.03  UV Disinfection Plan View
35.04  Panel Section MCC-10
35.05  Panel Section MCC-11
35.06  UV Lamp Module Cross Section
35.07  UV Disinfection Cross Section
35.08  Disinfection Channel #2 Cross Section
35.09  Disinfection Basin P&ID

Section 40.  Air Treatment System

40.01  Scrubber Recirculation Pump Auxiliary   START/STOP Push-buttons
40.02  Makeup Water Rotameter
40.03  Blowdown Valve OCR Handswitch
40.04  Chemical Feed Pump Local Panel
40.05  Location of the ORP and pH Probes
40.06  Air Treatment System Plan View
40.07  Air Treatment System Cross Section
40.08  Scrubber Tower Detail
40.09  Air Treatment P&ID

Section 45.  Chemical Delivery System

45.01  Dilution Water Rotameter
45.02  Chemical Building Plan View
45.03  Chemical Building View of South Wall
45.04  Chemical Feed System Cross Section
45.05  Chemical Feed System P&ID

Section 50.  In-Plant Washdown Pump Station

50.01  LP-14051
50.02  In-Plant Pump Station Plan View
50.03  In-Plant Pump Station Cross Section

Section 55.  RAS/WAS Pump Station

55.01  Pump Section MCC-09
55.02  RAS Pump AFD Panel
55.03  Secondary Scum Pump Auxiliary START/STOP Push-Button and Scum/Water Handswitch
55.04  RAS/WAS PS Upper Level Plan View
55.05  RAS/WAS PS Lower Level Plan View
55.06  Secondary Scum Box Plan View
55.07  RAS/WAS Pumping P&ID

Section 60.  RAS/WAS Pump Station

60.03  W2 Pump Devices on Panel LP-11040

Section 65.  Staffing Plan

65.01  Staffing Plan Recommended for the MPWRF

Section 75.  Maintenance

75.01  Preventive Maintenance Task Listing
75.02  Preventive Maintenance Schedule